Skip to content
Pinnacle Contracting — Building Higher Standards
Office interior mid-reconfiguration with new walls and staged millwork

Project

Office Floor Reconfiguration

Reconfiguring an existing office floor: walls opened and rebuilt, services coordinated, finishes brought back to a single standard.

Category
Renovation
Location
Toronto, ON

NotePhotography is Pinnacle’s own work on this type of project. The written details below are drafts awaiting client confirmation.

The Challenge

Where we started.

Reconfiguration is harder than new build. Existing services run where the drawings say they do not, ceiling grids never line up with the new layout, and the old finish rarely matches the new one.

Scope

  • Selective demolition and new partition construction
  • Ceiling grid and lighting coordination
  • Drywall repair and finishing across old and new surfaces
  • Full repaint to bring the floor to one standard
  • Protection of flooring, furniture and equipment in place

The Solution

How we ran it.

Existing conditions were opened and recorded before the new layout was set, so changes were priced with the facts rather than assumptions. Old and new surfaces were finished together so the completed floor reads as one space.

Results

  • Old and new surfaces finished to one consistent standard
  • Services and ceiling grid coordinated with the new layout
  • Furniture and flooring protected in place throughout

Gallery

Project detail.

New partition walls framed and finished with floors protected
Protected flooring and finished walls in a room under construction
Corridor under reconstruction with new drywall and ceiling work
Residential tower entrance at dusk with a warmly lit lobby

Start a Project

Planning something similar?

Tell us about your renovation project. We will walk the site, document the conditions and come back with a scope you can actually price against.