
Service
Flooring & Millwork
Vinyl plank, laminate and engineered floors installed over a properly prepared subfloor, plus cabinetry and built in millwork.
Get a free estimate.
Four quick fields. We call you back to scope it and price it.
Scope of work
- Removal and disposal of existing flooring
- Subfloor inspection, levelling and repair
- Vinyl plank, laminate and engineered flooring
- Transitions, thresholds and stair nosings
- Cabinetry, vanity and built in millwork installation
- Baseboard reinstated and finished after install
In Action
Flooring & Millwork, Done Properly.
Illustrative photography of the trades we offer. Pinnacle’s own completed jobs are in Projects.

Flooring & Millwork
Oak stair treads

Flooring & Millwork
Vanity and millwork install
Project Process
How a Flooring & Millwork Project Runs.
- 01
Measure
Rooms are measured and the subfloor is checked for level and moisture.
- 02
Prepare
Old flooring removed, subfloor levelled and repaired as needed.
- 03
Install
Flooring and millwork installed square, level and secure.
- 04
Finish
Transitions fitted, trim reinstated and the space cleaned down.
Related Work
Projects in this area.
FAQ
Questions we get asked.
Can new flooring go over the old floor?
Sometimes. It depends on what is there and how flat it is. We will tell you on site whether it is sound to go over or whether the old floor needs to come up.
Do condo buildings have flooring rules?
Many do, especially around sound transmission and underlay. We check your building's requirements before ordering materials.
Do you supply the flooring or can I buy my own?
Either works. We can source materials, or install flooring you have already chosen, as long as it suits the space.

Start a Project
Planning a flooring & millwork project?
Send us the details and we will come back with a straight read on scope, sequence and what it takes to do it properly. We respond within 1 to 2 business days.

